The report a bank can act on.
A detailed project report is worth exactly what its feedstock numbers are worth. Ours start in the field: residue mapped, moisture measured, seasonality priced in. The same discipline our own reference DPR passed through evaluation at IIT (BHU) Varanasi and SSS NIBE Kapurthala.
Bankable
LENDER-READY FORMAT
Field data
NOT DESKTOP ESTIMATES
SATAT/MNRE
COMPLIANCE MAPPED
Evaluated
IIT (BHU) · SSS NIBE
Evaluated work
IIT (BHU) Varanasi
Technical and financial evaluation of our reference DPR: SATAT/MNRE compliant, feasible.
SSS NIBE Kapurthala
Independent technical evaluation: design feasible and recommended.
Proven on our own plant
Cost, yield and downtime assumptions come from operating the 10 TPD research plant.
Inside the report
Six chapters, no padding.
| Feedstock study | Residue mapping, seasonality, moisture and competing uses, priced by season. |
|---|---|
| Process design | Digestion, purification and slurry line sized to the actual feedstock mix. |
| Mass & energy | Balance sheets for gas, fertiliser, water and power the design must obey. |
| Capex & opex | Itemised cost model with vendor-quoted anchors, not thumb rules. |
| Revenue & sensitivity | Gas and fertiliser revenue under SATAT pricing, stress-tested. |
| Compliance map | SATAT, MNRE, GOBARdhan and state clearances, sequenced with timelines. |
02
The sequence
Field to bank-ready.
01
Data room
Your site, land, utility and market inputs gathered.
02
Field study
Feedstock and site surveyed, sampled, tested.
03
Model
Technical and financial model built and stressed.
04
Draft & review
You and your lender read it; we defend it.
05
Issue
Bank-ready DPR, with us on call for queries.
Deciding whether to build?
A feasibility study is the cheapest mistake-preventer in this industry. Start there.